In Oct. 2008, the U.S. Navy will begin construction of the first of two lead DDG 1000 Zumwalt-Class destroyers -- at an expected cost of $6.3 billion. Given the history of cost growth on shipbuilding programs, as well as the Navy¿s request for approval of a third ship, the author was asked to assess the progress of the program. He examined: (1) whether key systems can be delivered on time and work as intended; (2) design maturity; (3) shipyard readiness; and (4) whether lead and follow-on DDG 1000 ships can be built within budget. Includes recommendations. Charts and tables.